- When
- Verify the final inspection before treating this upgrade as complete.
- What to check
- Request the final inspection and service-upgrade sign-off. An issued permit alone does not prove the work is finished.
Read the evidence & source
Why this estimate?
A permit dates the planned work. The final inspection, rather than the issue date, establishes whether the upgrade was signed off.
How the cost is estimated
Sample report planning range for Los Angeles. National replacement bands are adjusted for local costs and the affected units. This is an estimate, not a contractor quote.
LADBS electrical permit 25041-90000-01698, issued 2025-01-15 and not yet finaled: a 400A main service with 13 meters (10 existing units, 1 house, 2 new ADUs). An earlier permit for the same work, 24041-90000-53049, was closed 2026-02-25.
Source: LADBS permit, age-based cost estimate. issued in 2025; completion unconfirmed.